Slate has a Calendar widget to render time and/or date based events in a calendar overview grouped by month, week or day. It would be great to have such a widget in Workshop to natively display events, allow selection, filtering and interaction, e.g. to render or adjust a production schedule or training schedule.

Workaround: Embed a Slate App module in a Workshop module and send the data back and forth between the two apps. Disadvantage is the cumbersome back and forth exchange of data flowing between the two apps and the different style (look & feel) of the two apps.

5 Likes

Hey - Calendar widget coming to workshop very soon!

4 Likes

The Workshop Calendar widget is now available!

1 Like

Hey Michael, see below screenshots. Dark mode doesn’t work on the Calendar widget.

Also on a monthly view the boxes look jammed up. Is it possible to make the calendar expand vertically with flex? For example only 2 -3 objects fit in a box before its unreadable, we are trying to fit 7-8 objects / day on a monthly calendar.

Lastly is it possible to drag and drop objects to edit timestamps like an in-line edit action? That would really help our team schedule critical events efficiently.

1 Like

Hey Nick, were you able to figure out how to expand the calendar vertically/change the time increments on the left?

Same with the drag and drop schedules - mine show up and I am able to move them with a modify time action but it always fails to apply the changes?

Hi Elios,

No, the Calendar still doesn’t flex vertically to display all the items in a day.

We have figured out how to change the increments on the daily and weekly calendars but my concern was with flexing the size so everything in the month is visible.

1 Like

We really like the Calendar widget in Workshop, however, we perceive there’s ways to make it even better.

  1. In the Month view, it overflows the pucks beyond 3. For our use-case, showing at least 5 would be best, or as many as will fit on the screen. We could have upwards of 20+ pucks (20+ is more applicable to day and week views)

  2. Extended the Hide Time functionality within layers to include options for hiding time in the day and week views

  3. In the Week view, the range displayed is in months Ex: Dec 2025 - Jan 2026; it would be nice if this instead showed the start and end dates for the week Ex: Dec 28, 2025 - Jan 3, 2026

  4. In the Month view, show only days in the current Month Ex: Some Jan 2026 dates are visible when viewing Dec 2025; feature update would only show Dec 2025 dates.

Example of pucks stopping at 3 per day in Month view.